Construction Progress Update 3-14-2018

Most work being done on the Phase 1 Buildings continue to be allocated towards Xcel and getting heat and electricity to those residences. When that is finalized, things like carpet, appliances, and plumbing fixtures will be able to start going in! Outside of Xcel, progress does still continue.

Stringers along the stairwells of Building A Residences were being installed today.

Light fixtures are going in Building B residences, today specifically they were being installed in 1228 E. Asbury (Residence 8).

Phase 2:

Building E – MEP work continues making steady mechanical and plumbing advancements throughout the five residences.

Building F – MEP is appearing to near completion on these residences as electrical boxes and fixtures are set. Insulation is stocked, drywall installation is not too far off in the future. (See picture)

Building G – Framing is now up all the way to the roof (see picture)