Construction Update

Phase 1:

Pavers are officially completely installed, and the site looks amazing.

Phase 2:


Building E: (1288 – 1258 E. Asbury) – Kitchen backsplashes are installed throughout all five residences, and hardwood floors are stained through the four southern residences.

Builidng F: (2011 – 2021 S. Marion) – Minor paint detail is being finished.

Building G: (2005 S. Marion) – Baseboards are being installed. Cabinets are installed in the kitchen as well as both the Master and Guest bathrooms. Tile work is progressing well throughout all bathrooms.

IMG-1082-768x576.jpg
IMG-1078-768x576.jpg