Construction Update - July 17th

Single Family Homes Phase 1:


The Curb appeal of Marion Place is skyrocketing with the grass and planters being in surrounding the phase 1 residences. The homes look beautiful from the inside and out!

Concrete work for the alley way between phase 2 buildings is complete (see photo before)


Building E (1288 E. Asbury – 1258 E. Asbury) – Countertops are being installed along with plumbing fixtures. Bathroom tile work is finishing up as well. These residences are really starting to come together and they look great. (see attached master bath picture)

Building F (2011 – 2021 S. Marion) – Stucco work has commenced on the exterior of the building (see attached pictures)

Residents-overhead.jpg